What Does House Rewiring Involve in West Sussex?

A full rewire is one of the bigger jobs a property can need, but it often only comes up after an EICR flags a problem or someone starts planning a renovation. This guide explains what house rewiring involves along the West Sussex coast, from the first survey to the final certificate, so you know what to expect before anyone lifts a floorboard.

Signs a property may need rewiring

Age alone does not mean a property needs rewiring, but wiring over 25 to 30 years old deserves a proper inspection. Many of the Victorian and Edwardian terraces in Hove and Brighton, and the interwar semis around Lancing, Shoreham and Goring, have been partly updated over the years. That often leaves a mix of old and new cable that is hard to judge without testing.

The most reliable way to find out is an Electrical Installation Condition Report (EICR). If it records C1 or C2 codes across several circuits, or finds deteriorated cable insulation, a rewire is often more sensible than repairing faults one by one.

  • Rubber, lead or fabric sheathed cable, usually visible near the fuse board or in the loft
  • An old fuse box with rewireable fuses and no RCD protection
  • Scorch marks, warm sockets or a burning smell
  • Few sockets, with extension leads used in most rooms
  • Breakers that trip often for no obvious reason

What happens during a rewire

A rewire usually happens in two main stages, with plastering and decorating in between. Knowing the order helps you plan around it.

  • Survey and quote: the electrician checks the existing installation and agrees socket, switch and lighting positions with you
  • First fix: old cables are removed or disconnected, and new cables are run through walls, ceilings and under floors, with channels cut into plaster where needed
  • Making good: walls are filled or replastered, ideally before any redecorating
  • Second fix: sockets, switches, light fittings and a new consumer unit are fitted and connected
  • Testing and certification: every circuit is tested before the installation is handed over

How long it takes and how disruptive it is

A typical two or three bedroom house usually takes somewhere between five and ten working days for the electrical work, depending on size, access and how much the layout is changing. Larger homes or properties with solid walls and concrete floors can take longer.

It is messy work. Floorboards come up, carpets need lifting and there will be dust. Some people stay in the property and move between rooms; others time the job for an empty property between tenancies or before moving in. Power can usually be restored to some circuits at the end of most working days.

Cost depends on the number of rooms and circuits, the type of walls and floors, whether you are adding extras like more sockets, outdoor points or an EV charger supply, and how much making good is included. Ask for a written, itemised quote so you can compare like with like.

Landlords, HMOs and small business premises

Private landlords must have the electrical installation inspected and tested at least every five years and act on any remedial work an EICR identifies. If the report shows widespread problems, a planned rewire between tenancies is usually cheaper and less disruptive than a series of urgent repairs.

HMO landlords should think about fire alarms at the same time. With walls and ceilings already open, it is a good moment to install or upgrade a mains powered, interlinked fire alarm system that meets the property's risk category. For small shops and offices, rewiring is often planned around a refit so that trading is disrupted as little as possible.

The paperwork you should get at the end

A rewire is notifiable work under Building Regulations. A registered contractor, such as a NICEIC approved one, can self certify it and notify Building Control for you. When the job is finished you should get an Electrical Installation Certificate with the test results, and a Building Regulations compliance certificate should follow.

Keep these safe. You will need them when you sell, remortgage or show a letting agent or insurer that the installation is compliant. At ETSE Compliance we also send photographs of the work with the certificate, so you have a record of what sits behind the plaster.

Published 17 November 2026

Frequently asked.

Can I stay in my home during a rewire?+

Often yes, though it means living with dust, lifted floors and periods without power. Many households move between rooms as the work progresses, while others stay elsewhere for the noisiest days.

Do I need to redecorate after rewiring?+

Usually some redecorating is needed, because cables are chased into walls and ceilings. It is best to plan any plastering and painting for after the first fix, not before.

Is a partial rewire ever enough?+

Sometimes. If an EICR shows that most of the wiring is sound and the problems are limited to one or two circuits, replacing just those circuits and upgrading the consumer unit can be a reasonable option.

Related help.

Need an electrician
this week?

EICR, EV charger, fuse board, fire alarm or full installation. Call the office or send a few details and we will come back with a price.

Get a quote.

Tell us about the job. We will come back with a price, or come out to take a look. EICRs, installations, EV chargers and fire alarm systems across West Sussex.